AEC metro station

AEC
Ahmedabad Metro station
General information
LocationDharm Nagar II, Sabarmati, Ahmedabad, Gujarat 380005
Coordinates23°04′30″N 72°35′36″E / 23.07511°N 72.59321°E / 23.07511; 72.59321
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Red Line
PlatformsSide platform
Platform-1 → Sector-1 / GIFT City
Platform-2 → APMC
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
StatusOperational
History
Opened6 October 2022; 2 years ago (6 October 2022)
Electrified750 V DC third rail
Services
Preceding station Ahmedabad Metro Following station
Sabarmati
towards Sector-1 or GIFT City
Red Line Sabarmati Railway Station
towards APMC
Location
Map

AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1][failed verification] Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.

This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2][3][4][5]

  1. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  2. ^ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  3. ^ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
  4. ^ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  5. ^ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.