Ahmedabad Metro

Ahmedabad Metro
Ahmedabad metro train
Ahmedabad metro train
Overview
Native nameઅમદાવાદ મેટ્રો
OwnerGujarat Metro Rail Corporation Limited
Area servedAhmedabad Metropolitan Reigon
(Gandhinagar)
(GIFT City)
Transit typeRapid transit
Number of lines2 (Phase-1)[1]
2 (Phase-2)
Line numberFully operational
Number of stations49 (Operational)
32 (Phase-1)
22 (Phase-2)
Daily ridership94,000 (Oct 2023- Sep 2024)[2]
Annual ridership3,45,47,000 (Oct 2023- Sep 2024)[2]
Chief executiveDurga Shanker Mishra (Chairman)
HeadquartersBlock No.1, First Floor, Karmayogi Bhavan, Sector 10/A, Gandhinagar-382010[3]
WebsiteGujarat Metro
Operation
Began operation4 March 2019; 5 years ago (2019-03-04)
Operator(s)Gujarat Metro Rail Corporation Limited
CharacterUnderground and elevated
Train length3 coaches
Technical
System length58.66 km (36.45 mi) (Phase-1)[4]
5.42 km (3.37 mi) (Phase-2) (under construction)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[5]
Electrification750 V DC Third rail
Average speed33 km/h (21 mph)
Top speed80 km/h (50 mph)
Preview warning: Page using Template:Infobox public transit with unknown parameter "logo"
Preview warning: Page using Template:Infobox public transit with unknown parameter "logo_size"
Ahmedabad Metro
Red Line
Extension
Mahatma Mandir
Sector-24
Sector-16
Juna Sachivalaya
Akshardham
Sachivalaya
Sector-10A
Sector-1
Infocity
Dholakuva Circle
Red Line
Branch Line
Randesan
GIFT City
Raysan
PDEU
GNLU
Koba Gam
Juna Koba
Koba Circle
Narmada Canal
Tapovan Circle
Vishwakarma College
Koteshwar Road
Phase-2
Phase-1
Motera Stadium
Thaltej Gam
Sabarmati
Thaltej
AEC
Doordarshan Kendra
Sabarmati Railway Station
Gurukul Road
Ranip
Gujarat University
Vadaj
Commerce Six Road
Vijay Nagar
SP Stadium
Usmanpura
Old High Court
Gandhigram
Paldi
Shahpur
Shreyas
Gheekanta
Rajiv Nagar
Kalupur Railway Station
Jivraj Park
Kankaria East
APMC
Apparel Park Depot
Gyaspur Depot
Apparel Park
Red Line
 
Amraiwadi
Rabari Colony
Vastral
Nirant Cross Road
Vastral Gam
Blue Line
 

Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad and Gandhinagar in Gujarat state of India. Currently the System is 58.66 km (36.450 mi) and has 38 stations.[6]

The Gujarat Metro Rail Corporation Limited was established in February 2010 and the 40.03 km (24.873 mi) long Phase–1 of the project was approved in October 2013 with two corridors, North–South and East–West. The construction started on 14 March 2015. A 6.5 km (4.039 mi) section of East–West corridor was inaugurated on 4 March 2019 and opened to the public on 6 March 2019. The rest of the Phase–1 was inaugurated on 30 September 2022 and opened to public on 2 and 6 October 2022; except the Thaltej Gam end and three stations.[7]

  1. ^ "Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on March 4". 21 February 2019.
  2. ^ a b Cite error: The named reference DG23A was invoked but never defined (see the help page).
  3. ^ "Contact Us – MEGA". gujaratmetrorail.com. Retrieved 7 April 2018.
  4. ^ "MEGA Map 2014". MEGA. Archived from the original on 25 July 2015. Retrieved 25 July 2015.
  5. ^ "Ahmedabad launches metro train tender". IRJ. 1 February 2014.
  6. ^ "Ahmedabad Metro - Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 22 September 2024.
  7. ^ "Ahmedabad Metro Route Map, Station List, Progress and Latest Updates - Infra Info Hub". 6 June 2024. Retrieved 15 July 2024.