General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Yuhuatai District, Nanjing, Jiangsu China | |||||||||||||||
Operated by | Nanjing Metro Co. Ltd. | |||||||||||||||
Line(s) | ||||||||||||||||
Construction | ||||||||||||||||
Structure type |
| |||||||||||||||
Other information | ||||||||||||||||
Station code | 116(Line 1) 1011(Line 10) | |||||||||||||||
History | ||||||||||||||||
Opened | 3 September 2005 1 July 2014 (Line 10) | (Line 1)|||||||||||||||
Services | ||||||||||||||||
|
Andemen station (simplified Chinese: 安德门站; traditional Chinese: 安德門站; pinyin: Āndémén Zhàn), is a transfer station of Line 1 and Line 10 of the Nanjing Metro. It started operations on 3 September 2005 as part of Line 1's Phase I that ran north to Maigaoqiao;[1] the previous branch of Line 1 from this station to Olympic Stadium was re-designated as Line 10 when that line opened on 1 July 2014,[2][3] and Andemen became the eastern terminus of Line 10.
The station is located in Nanjing's Yuhuatai District; the Line 1 station is situated between Xiaohang Road (小行路) to the west and Andemen Street (安德门大街) to the east, while the Line 10 station is situated along the latter thoroughfare. The two-level station has a total area of 4,860.80 m2 (52,321.2 sq ft),[4] and the Line 1 station is elevated with two side platforms, while the Line 10 station is underground with an island platform.
9月3日 南京地铁一号线一期工程开通试运营
Find the station name and direct your mouse pointer to it, wait until the icon turns into a darker color, and click.