Central Area Transmission System

CATS pipeline
Location
CountryNorth Sea, United Kingdom
General directionnorth-south-west, 210°
FromCATS Riser Platform (Block 22/10a) bridge linked to North Everest
Passes throughCentral North Sea
ToCATS processing terminal in Teesside, England
General information
Typenatural gas
PartnersAntin Infrastructure Partners, Eni, Chrysaor
OperatorKellas Midstream Limited
Commissioned1993
Technical information
Length404 km (251 mi)
Maximum discharge1.7 billion standard cubic feet per day
Diameter36 in (914 mm)
CATS Terminal
The Central Area Transmission System terminal is located in the middle of the Seal Sands Petrochemical Complex, seen here from the air
Central Area Transmission System is located in County Durham
Central Area Transmission System
Location within County Durham
General information
TypeGas terminal
LocationSeal Sands, Middlesbrough, TS2 1UB
Coordinates54°36′44″N 1°11′42″W / 54.6123°N 1.1951°W / 54.6123; -1.1951
Elevation5 metres
InauguratedMay 1993
OwnerAntin Infrastructure Partners
Technical details
Floor area70 acres (280,000 m2)

The Central Area Transmission System (known as CATS) is a natural gas transportation and processing system that transports natural gas through a 404 kilometre pipeline from the Central North Sea to a reception and processing terminal at Teesside in the North East of England.