Circular light rail | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Traditional Chinese | 環狀輕軌 | ||||||||||||||||||
Simplified Chinese | 环状轻轨 | ||||||||||||||||||
|
The Kaohsiung Circular Light Rail (Chinese: 高雄環狀輕軌) is a light rail loop line in Kaohsiung, Taiwan, operated by the Kaohsiung Rapid Transit Corporation.[7] The line stretches over a length of 22.1 kilometers and has 38 stations. The southern part of this line makes use of the defunct tracks of the Kaohsiung Harbor Railway Line. Construction cost was forecasted to be 16.5 billion New Taiwan dollars.[8]
Phase I consists of the section of the line from Station C1 to Station C14, of which Stations C3 and C14 are transfer stations to the KMRT Red line and Orange line, respectively. Construction of Phase I began on 4 June 2013.[9] Stations C1 to C14 were open on a test-basis (free for the public[10]) from August 2015, and commenced formal operations in September 2017.[11][12]
Phase II construction of the northern section partially began on 12 January 2021[13] after the underground relocation of the Kaohsiung urban railway. The northern part of Phase II was scheduled to be opened in June 2021 along with the rest, but was delayed until 1 January 2024 due to local opposition.[14][15]