Location | |
---|---|
Location | Diabari, Dhaka, Bangladesh |
Coordinates | 23°52′41″N 90°21′21″E / 23.8780112°N 90.3558237°E |
Characteristics | |
Owner | Road Transport and Highways Division |
Operator | Dhaka Mass Transit Company Limited |
Type | At-Grade |
Roads | Sonargaon Janapath, Mirpur Road |
Rolling stock | Kawasaki Railcar Manufacturing |
Routes served | MRT Line 6 |
History | |
Opened | June 2022 |
Diabari Depot (Bengali: দিয়াবাড়ি ডিপো), officially Uttara Depot (Bengali: উত্তরা ডিপো), is a railway depot of the Dhaka Metro Rail's MRT Line 6, located before Uttara North station in northern Dhaka. It is the first depot on the metro lines of Dhaka, having been built in 2022, when the MRT Line 6 was under construction.