Dove Holes Tunnel

Train leaving Dove Holes Tunnel
Location of the tunnel within the Peak District

Dove Holes Tunnel is a tunnel built by the Midland Railway between Peak Forest Signal Box and Chapel-en-le-Frith in Derbyshire in 1860–64, now carrying the Great Rocks Line.

In the mid-nineteenth century, the Manchester, Buxton, Matlock and Midlands Junction Railway was jointly leased by the LNWR and Midland Railway, and ran as far as Rowsley. The Midland wished to extend to Manchester to give it a service to London but the LNWR, having its own London line, declined. It then supported the Stockport, Disley and Whaley Bridge Railway in building a line from Whaley Bridge to Buxton, one which the Midland considered unsuitable as a main line, due to its steep gradients over Cow Low.

In the end, however, the Midland came to an agreement with the Manchester, Sheffield and Lincolnshire Railway that was formalised as the Sheffield and Midland Railway Companies' Committee. The Midland would extend its line to New Mills to meet a line the MS&LR was building from its main line out of Manchester.

The Midland constructed a junction on its Buxton line at Peak Forest Signal Box which ran under Dove Holes in a tunnel 2,984 yards (2,729 m) long, some 183 feet (56 m) beneath the LNWR line. The entrance was at the summit of the line, nearly 1,000 feet (300 m) above sea level, and descended nearly a hundred feet at a gradient of 1 in 90.[1]

  1. ^ Radford, B., (1988) Midland Though The Peak Unicorn Books