Feather Headwaters

Buzzard Springs (foreground), a partial source of the North Fork Feather River.

The Feather Headwaters is the watershed of the Feather River above Lake Oroville, totaling 3,450 sq mi (8,900 km2). Subdivided into 3 watersheds, the North Fork Feather Watershed is 1,090 sq mi (2,800 km2)—including the West Branch drainage of about 282.5 sq mi (732 km2), the East Branch North Fork Feather Watershed is 1,010 sq mi (2,600 km2),[1] and the Middle Fork Feather Watershed is 1,350 sq mi (3,500 km2)[1]—including the South Fork drainage of about 132 sq mi (340 km2).[2] Headwaters drainage is impaired by the Palermo Canal at Oroville Dam, the Hendricks Canal at the West Branch Feather River, and the Miners Ranch Canal at the South Fork's Ponderosa Reservoir. Additionally, the Pacific Gas and Electric Company releases Upper Feather water into the Hyatt Generating-Pumping Plant for hydroelectric generation during daily peak demand.[specify]

  1. ^ a b "Boundary Descriptions and Names of Regions, Subregions, Accounting Units and Cataloging Units". USGS.gov. Retrieved August 22, 2010.
    a. "sum, USGS watershed values (Lower Feather + North Fork + East Branch + Middle Fork + Honcut Headwaters + Upper Yuba + Lower Yuba + Upper Bear + Lower Bear". Google Calculator. Retrieved September 24, 2010.
  2. ^ USGS Gage #11397000 on the South Fork Feather River at Enterprise. Accessed 2010-09-29