Fuller Warren Bridge (new) | |
---|---|
Coordinates | 30°18′54″N 81°40′18″W / 30.315°N 81.67166667°W |
Carries | Eight lanes of I-95 |
Crosses | St. Johns River |
Locale | Jacksonville, Florida |
Official name | Fuller Warren Bridge |
Maintained by | Florida Department of Transportation |
ID number | 720156 |
Characteristics | |
Design | Prestressed concrete girder bridge |
Total length | 7,500 feet (2,286.0 m) |
Width | Eight general purpose lanes Three auxiliary lanes Shared-use path |
Longest span | 250 feet (76.2 m) |
Clearance above | Unlimited |
Clearance below | 75 feet (22.9 m) |
History | |
Opened | April 16, 2000 November 17, 2002 (All lanes opened) | (Partially completed for I-10 Eastbound to I-95 Southbound traffic)
Location | |
Fuller Warren Bridge (old) | |
---|---|
Coordinates | 30°18′54″N 81°40′18″W / 30.315°N 81.67166667°W |
Carries | four general purpose lanes |
Crosses | St. Johns River |
Locale | Jacksonville, Florida |
Official name | Fuller Warren Bridge |
Maintained by | Florida Department of Transportation |
ID number | 720156 |
Characteristics | |
Design | steel bascule bridge |
Total length | 111.77 meters (367 ft) |
Width | 18.8 meters (62 ft) |
Longest span | 81.4 meters (267 ft) |
Clearance above | Unlimited |
Clearance below | 13.4 meters (44 ft) closed |
History | |
Opened | June 7, 1954 |
Closed | November 17, 2002 |
Location | |
The Fuller Warren Bridge is the prestressed-concrete girder bridge that carries Interstate 95 (I-95) across the St. Johns River in Jacksonville, Florida. The current structure was finished in October 2002, replacing the original bascule-bridge span, finished in 1954.
The current bridge was designed by HNTB Corporation in 1990 and built by Balfour Beatty Construction.[1] It is over 7,500 ft (2,286 m) long, with a main span of 250 feet (76 m), and a vertical clearance of 75 ft (23 m). When completed in 2000, it carried eight lanes across the span.
In the spring of 2018, a construction project began to add two more lanes and a shared-use path to the bridge which was completed in spring 2023.
The eastern end of the transcontinental Interstate 10 (I-10) meets I-95 just west of the bridge.