Guanqiao station

Guanqiao

官桥
Guangzhou Metro
Metro Guanqiao station is proposed to be built on the southwestern side of Guanqiao North (Guanqiaobei) railway station
Chinese name
Simplified Chinese官桥站
Traditional Chinese官橋站
Transcriptions
Standard Mandarin
Hanyu PinyinGuānqiáo Zhàn
Yue: Cantonese
Jyutpinggun1 kiu4 zaam6
General information
LocationPanyu District, Guangzhou, Guangdong
China
Coordinates22°59′01″N 113°26′20″E / 22.983511°N 113.438881°E / 22.983511; 113.438881
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 4
Platforms2 (2 side platforms)
Tracks2
ConnectionsPRDIR Guanqiao North
Construction
Structure typeElevated
Other information
Station code416
History
Opening2026[1]
Services
Preceding station Guangzhou Metro Following station
     Line 4 does not stop here

Guanqiao station (simplified Chinese: 官桥站; traditional Chinese: 官橋站; pinyin: Guānqiáo Zhàn; Jyutping: gun1 kiu4 zaam6) is a future elevated station of Line 4 of the Guangzhou Metro. It will be located at Guanqiao Village (Chinese: 官桥村), Shilou Town (Chinese: 石楼镇), Panyu District, Guangzhou. The station began construction in December 2023 and will be completed by the end of 2026.[1][2]

  1. ^ a b "广佛南环、佛莞城际开通倒计时 换乘地铁需出闸或出站". 地铁官桥站正在建设,最快后年建成……最快有望2026年底建成
  2. ^ "四号线官桥站终于要建了,可换乘佛莞城际". dayoo.com. 2021-02-03. Archived from the original on 2021-02-13.