HNoMS Maud sailing from the shipyard under Norwegian command
| |
History | |
---|---|
Norway | |
Name | HNoMS Maud |
Ordered | 28 June 2013 |
Builder | Daewoo Shipbuilding & Marine Engineering, South Korea |
Laid down | 15 December 2015 |
Launched | 4 June 2016 |
Christened | 21 May 2019 |
Acquired | 16 November 2018 |
Commissioned | 21 May 2019 |
Homeport | Haakonsvern naval base |
Identification |
|
Status | In active service |
Badge | |
General characteristics | |
Type | Replenishment oiler |
Displacement | 27,500 long tons (27,941 t) |
Length | 183 m (600 ft 5 in) |
Beam | 25.9 m (85 ft 0 in) |
Draught | 8.62 m (28 ft 3 in) |
Propulsion | Diesel Hybrid (CODLOD)
2 × 7,500 kW Wärtsilä main engines 2 × 3,170 kW Wärtsilä diesel generators 2 × 1,000 kW Wärtsilä bow thrusters |
Speed | 18 knots (33 km/h; 21 mph) |
Range | 10,000 nmi (19,000 km; 12,000 mi) |
Complement | 43 core + up to 116 additional |
Armament | 4 × Sea Protector |
Aircraft carried | Hangar space for 2 × Medium-Sized Helicopters |
HNoMS Maud is a replenishment oiler constructed at Daewoo Shipbuilding & Marine Engineering in South Korea. She was built on behalf of the Norwegian Defense Materials Agency Forsvarsmateriell , for service in the Royal Norwegian Navy.[1]