Indore-Dewas-Ujjain section | |
---|---|
Overview | |
Status | Partially Operational |
Owner | Indian Railway |
Locale | Madhya Pradesh |
Termini | |
Service | |
System | Western Railway |
Operator(s) | Ratlam railway division |
Technical | |
Track length | 79 km (49 mi) |
Number of tracks | 2 |
Track gauge | 5 ft 6 in (1,676 mm) broad gauge |
Electrification | Yes |
Operating speed | 100 km/h (62 mph) |
The Indore-Dewas-Ujjain section of the Western Railway Zone is a partially operational public transit system in the state of Madhya Pradesh. It connects Indore Jn with Ujjain Jn on Ujjain-Bhopal section and Dewas Jn on Dewas-Maksi section. It is currently operational as a single-track electrified railway line, and is undergoing doubling.[1]
The tentative time of completion of the project is slated to be March 2023. The work is being done by Ratlam railway division of Western Railways.[2]