Jackson Hydroelectric Project

The Jackson Hydro powerhouse, with the outflow into the Sultan river visible beneath.
The step-up transformers behind the powerhouse, boosting the generator voltage to 115,000 volts for transmission.

The Henry M. Jackson Hydroelectric Project, or Jackson Hydro Project, is an electric power generating project on the Sultan River operated and maintained by the Snohomish County Public Utility District in Washington, co-licensed by the city of Everett, Washington.[1] Beginning operations in 1984, the project aims to bring clean and renewable hydropower to Snohomish county. The facility consists of a single powerhouse, two main generating units, a switch-yard, and transmission lines—all of which are directly connected to the county's local 115 kV power-transmission network.[2] The largest generating station operated by the Snohomish county PUD, the Jackson Hydro powerhouse has a total nameplate capacity of 112 megawatts, enough to power 53,200 homes, and accounts for 7 percent of the Snohomish county PUD's total power needs. The vast remainder of the Snohomish county PUD's power comes from the Chief Joseph Dam, located in eastern Washington, through long-term contracts with the Bonneville Power Administration.[3]

  1. ^ "Hydropower Reform Coalition".
  2. ^ "Jackson Hydro Project".
  3. ^ "Power Supply".