Jiamin line

Jiamin line
 Jiamin 
Overview
Other name(s)L3 (planned name Shanghai Metro)
Line 17 (planned name Shanghai Metro up to 2011)
StatusUnder construction
LocaleShanghai, China
Termini
Connecting lines 1   2   5   9   10   11   12   13   14   22   25   Airport Link 
Stations15
Service
TypeCommuter rail
SystemShanghai Suburban Railway
Operator(s)Shentong Metro Group
Rolling stockChina Railway CRH6
History
CommencedJune 28, 2021; 3 years ago (2021-06-28)
Planned opening2027[2]
Technical
Line length44.04 km (27 mi) km[2]
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (AC 25 kV)
Operating speed160 km/h (99 mph)

Jiamin line (Chinese: 嘉闵线; pinyin: Jiāmǐn xiàn) is a commuter rail line currently under construction on the Shanghai Suburban Railway, and will be run by Shentong Metro Group.[3] It runs from Yindu Road in Minhang District to Chengbei Road in Jiading District.[1] Construction started on 28 June 2021. The line is expected to open in 2027.[2]

  1. ^ a b "上海市轨道交通嘉闵线(城北路站—银都路站)选线专项规划(草案公示)" (PDF). 2020-11-13. Archived from the original (PDF) on 2020-11-13. Retrieved 2020-11-15.
  2. ^ a b c "本市17个交通建设工程集中开工 全面构建"五个新城"综合交通体系". 2021-07-01.
  3. ^ "上海规土局:机场联络线和嘉闵线已明确采用市郊铁路制式" (in Chinese). 澎湃新闻. 2016-08-10.