Kolkata Metro Line 4

Kolkata Metro Line 4
----
Yellow Line
Under construction Yellow Line near Bagjola canal
Overview
StatusUnder construction
OwnerIndian Railways
LocaleIndia Kolkata Metropolitan Region, India
Termini
Connecting linesBlue Line Orange Line
Stations10
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)
  • Noapara Depot
  • Airport Depot (under construction)
  • Barasat Depot (planned)
History
Planned openingMarch 2025
Technical
Line length
  • 18.13 km (11.27 mi)
    -Under construction:6.87 km (4.27 mi)
    -Planned:11.26 km (7.00 mi)[1]
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC[2] using third rail
Operating speed80 km/h (designed)
SignallingTPWS signalling (initially)
CBTC signalling (in future)
Route map
Noapara
Kestopur Canal
Dum Dum Cantonment
Jessore Road
Jai Hind Netaji Subhas Chandra Bose International Airport Bus interchange
Birati
Michael Nagar
New Barrackpur
Noai Canal
Madhyamgram
Hridaypur
Barasat Bus interchange

(Click to expand)

Line 4 (Yellow Line) is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It is a 16.876 km (10.486 mi)[1] long line from Noapara to Barasat in North 24 Parganas, which is under construction. It is being built by RVNL, Senbo & ITD.[3] It will run mostly on underground tunnels, the track will be elevated until Jessore Road from Noapara and then go underground towards Barasat metro station. It will have an interchange at the Kolkata Airport with Orange Line.

  1. ^ a b "New System Map of Kolkata Metro".
  2. ^ "CAF to supply Kolkata metro trains".
  3. ^ "Senbo Engg wins ₹532 crore underground civil contracts for Kolkata Metro Line 4 | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 12 April 2023.