La Normal metro station

La Normal
Line 3 of the Guadalajara urban rail system
SITEUR light rail
The station in 2021
General information
LocationGuadalajara
Jalisco, Mexico
Coordinates20°41′42″N 103°20′55″W / 20.69500°N 103.34861°W / 20.69500; -103.34861
Line(s)3
Construction
Structure typeUnderground
Bicycle facilitiesYes
AccessibleYes
History
Opened2020
Services
Preceding station Logo T de SITEUR Sistema de Tren Eléctrico Urbano Following station
Ávila Camacho Line 3 Santuario

La Normal is the tenth station of Line 3 of the Guadalajara Urban Electric Train System from south-east to north-west and the eighth in opposite direction. It's one the underground stations of said line, as well as the northernmost station from the underground tunnel before exiting to the surface towards the elevated viaduct Guadalajara-Zapopan.[1]

Over the station there's an urban bus station known as Centro de Transferencia Multimodal (short name CETRAM), which intends to ease transfers between train and bus.

This station is located next to the Glorieta La Normal, from which it takes its name. The tunnel boring machine La Tapatía began to build the tunnel for line 3 from this geographic point in 6 June 2016.[2] After a delay of one year, the tunnel was completed at the Plaza de la Bandera station in 24 May 2018.[3]

The tunneling works caused sewage leaking in the CUCSH university, so a representative of the Secretariat of Communications and Transportation ensured that they were in talks with the university rector to pay for the damages; though no amount was precised since the mediator was just on the way to verify the damages.[4]

The station logo is an upfront image of a train and three buses (the train is located at the top and the buses at the bottom), alluding to CETRAM.

  1. ^ Documento justificativo. "Propuesta arquitectónica de las estaciones, Línea 3 SITEUR". Archived from the original on 2017-01-07. Retrieved 2017-01-06.
  2. ^ SITEUR. "La Tapatía realiza los primeros trabajos". Archived from the original on 2017-01-08. Retrieved 2017-01-07.
  3. ^ El Financiero (25 May 2018). "Concluyen los trabajos de la tuneladora 'La Tapatía' en Jalisco". Retrieved 2018-05-28.
  4. ^ Correa Aldrete, David (2017-02-17). "Pagarán daños a UdeG ocasionados por obras de la Línea 3". Archived from the original on 2017-02-19. Retrieved 2017-02-18.