Line 10 (Shenzhen Metro)

Line 10
Overview
StatusIn operation
LocaleShenzhen, China
Termini
Stations24
Color on map     Pink (#F8779E)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Liangmao Hill Depot
Yitian stabling yard
Rolling stockCRRC Changchun (1001-1035) (Type A, 8 cars)
History
Opened18 August 2020; 4 years ago (2020-08-18)[1]
Technical
Line length29.3 km (18.2 mi)[2]
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC (overhead lines)
Operating speed80 km/h (50 mph)
SignallingCBTC
Route map

Huanggekeng
Dynamic Town
Guanjingtou
Youganpu
Longping Road
Shuangyong Street
Pinghu
Pinghu railway station
Hehua
Huanancheng
Mugu
Shanglilang
Liangmao Hill
Liangmao Hill Depot
Gankeng
Xuexiang
Gangtou
Huawei
Bei'er Road
Bantian North
Wuhe
Guangyayuan
Nankeng
Yabao
6
UpperLeft arrow to Songgang
 
connection to Line 9
Maling
Donggualing
connection to Line 3
Lianhuacun
Gangxia North
Gangxia
4 Up arrow to Niuhu
Fumin
Futian Checkpoint
4OSI
Yitian Stabling yard

Line 10 (simplified Chinese: 十号线; traditional Chinese: 十號線; pinyin: Shíhào Xiàn), also known as the Bantian line (坂田线; 坂田線; Bǎntián Xiàn) of the Shenzhen Metro began construction at the end of 2015.[3] The line opened on 18 August 2020.[1] Line 10 has a length of 29.3 km (18.2 mi) and a total of 24 stations.[2] It connects the Futian Checkpoint to Shuangyong Street. In the southern terminus of the line, a 555 meters long and 50.5 meters wide double deck underground depot capable of storing 16 trains will be constructed.[4]

  1. ^ a b "官宣!深圳地铁6、10号线8月18日开通初期运营". Shenzhen Metro. 2020-08-16.
  2. ^ a b "地铁6号、10号线传喜讯,计划明年年中迎客". 2019-12-03.
  3. ^ 地铁10号线拟于本月动工 深圳东部将增添轨道大动脉 - 深视新闻 - 城市联合网络电视台. www.cutv.com. Archived from the original on 2016-06-01. Retrieved 2016-12-13.
  4. ^ "深圳将有国内最大地铁停车场 可同时停16列车_广深新闻_新闻_星岛环球网". news.stnn.cc (in Chinese (China)). Retrieved 2018-07-21.