Line 20 | |
---|---|
20 | |
Overview | |
Native name | 上海地铁20号线 |
Status | Under construction |
Locale | Putuo, Baoshan, Jing'an, Yangpu, and Pudong, Shanghai |
Termini | |
Connecting lines | 1 3 7 8 10 11 15 18 19 21 |
Stations | 20 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai No. Metro Operation Co., Ltd. |
Depot(s) | Zhenru depot Xiangyin Road Parking Lot |
Rolling stock | Class A 6-car trains |
History | |
Commenced | December 16, 2022 |
Planned opening | 2027 |
Technical | |
Track length | 23.8 km (14.8 mi) (Phase 1 full section) |
Number of tracks | 2 |
Character | Fully underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 80 km/h (50 mph) |
Line 20 will be a future subway line on the Shanghai Metro. It will run in an east–west direction in northern Shanghai, connecting Shanghai West railway station in Jiading District to Gongqing Forest Park in Yangpu District, with a possible future extension to Zhouhai Road in northern Pudong.[1] It will be about 20 km (12 mi) long with 10 stations. The line was announced by the Municipal government in 2016.[2][3]