Line 3 (Beijing Subway)

Line 3
Exit A of Workers' Stadium Station (under construction), Line 3
Overview
Other name(s)M3 (planned name)
StatusUnder Construction (Phase I)
Termini
Stations10 (Phase I)[1]
Service
TypeRapid transit
SystemBeijing Subway
Rolling stockType A, 4-car / 8-car[2]
History
Planned openingDecember 2024[3]
Technical
Line length15.6 km (9.7 mi) (Phase I)[1]
CharacterUnderground[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

planned extension to Tiancun
Dongsi Shitiao
Left arrow inner – outer Right arrow
Workers' Stadium
Tuanjiehu
Left arrow inner – outer Right arrow
Chaoyang Park
connection canal between Shuidui Lake and Honglingjin Lake
Shifoying
Chaoyang railway station
Yaojiayuan
Dongbanan
Dongba
Ba river
Dongbabei
Dongba depot
Beixiao river
Guanzhuang Lu Xikou
Louzizhuangqiaoxi
Louzizhuang
Gaoxinzhuang
Caogezhuangbei

Line 3 of the Beijing Subway (Chinese: 北京地铁3号线; pinyin: běijīng dìtiě sān hàoxiàn) is a rapid transit line under construction, in Beijing, China. It is expected to open by the end of 2024.[3] It will be colored rose red in system maps.[2][4]

  1. ^ a b c "北京地铁3号线一期工程首站封顶". Xinhuanet. Retrieved November 12, 2020.
  2. ^ a b "北京3号线首列车在河北京车智能制造基地下线". July 6, 2022. Archived from the original on July 10, 2022.
  3. ^ a b Cite error: The named reference date2024 was invoked but never defined (see the help page).
  4. ^ "《公共交通客运标志 第2部分:城市轨道交通(征求意见稿)》". October 7, 2023. Archived from the original on April 22, 2023.