Line 3 (Changchun Rail Transit)

Line 3
A train entering Kuanping Bridge station
Overview
StatusOperational
OwnerChangchun
LocaleChangchun, Jilin, China
Termini
Stations34
Service
TypeLight Rail
SystemChangchun Rail Transit
Services2
Operator(s)Changchun Rail Transit Corporation
Depot(s)Huguang Road Depot
Ski Resort Depot
Rolling stockChangchun Light Rail:3000/3500 Stock/4000 Stock
History
Opened30 October 2002; 22 years ago (2002-10-30)
Technical
Line length34.3 km (21.31 mi)
Number of tracks2
CharacterUnderground, at-grade and elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead line750 V DC
Operating speed70 km/h

Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006[1] and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.

  1. ^ 12月26日长春轻轨二期将运行 可能采用阶梯票价. 搜狐新闻 (in Chinese). Archived from the original on 2014-02-02. Retrieved 2012-10-04.