Line 3 | |
---|---|
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | |
Stations | 34 |
Service | |
Type | Light Rail |
System | Changchun Rail Transit |
Services | 2 |
Operator(s) | Changchun Rail Transit Corporation |
Depot(s) | Huguang Road Depot Ski Resort Depot |
Rolling stock | Changchun Light Rail:3000/3500 Stock/4000 Stock |
History | |
Opened | 30 October 2002 |
Technical | |
Line length | 34.3 km (21.31 mi) |
Number of tracks | 2 |
Character | Underground, at-grade and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead line, 750 V DC |
Operating speed | 70 km/h |
Line 3 of the Changchun Rail Transit (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006[1] and 31 December 2021. This line is currently 34.3 km (21.3 mi) long with 34 stations in operation.