Line 5 (Chengdu Metro)

Line 5
5
Overview
StatusIn operation
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
  • Huagui Road
  • Huilong
Stations48
Service
TypeRapid transit
SystemChengdu Metro
Services2
Operator(s)Chengdu Metro Corporation
Depot(s)Huagui Road Depot
Rolling stock8-car Type A
History
Opened27 December 2019; 4 years ago (2019-12-27)
Technical
Line length49.018 km (30.5 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 V DC
Route map

Huagui Road
Dafeng depot
Baishuichang
Liaojiawan
Beibu Shopping Mall
Xingfuqiao
Jiudaoyan
Dujianian
Dafeng
Shixi Park
Huanghuayuan
Lujiaqiao 9
← Outer
Inner →
Quanshui Road
Dongzikou
Funing Road
Wukuaishi
Saiyuntai
2nd Beizhan Road West 7
← Outer
Inner →
Xibeiqiao 6
← Wangcongci
Lanjiagou →
Huapaifang
Fuqin 17
← Wansheng
Xihe →
← Xipu
Longquanyi →
Chengdu University of TCM &
Sichuan Provincial People's Hospital
2 4
Qingyang Taoist Temple
Provincial Orthopaedics Hospital
Gaoshengqiao 3
← Shuangliu West Station
Chengdu Medical College →
Keyuan
Jiuxing Avenue 8
← Lianhua
Shilidian →
Shenxianshu 7
← Inner
Outer →
Shiyang Flyover
Chengdu First People's Hospital
Jiaozi Avenue
Jincheng Avenue 9
← Inner
Outer →
Yuanhua depot
Jincheng Lake
Dayuan
Minle
Qilong
The Police College
Erjiang Temple
Nanhu Flyover
Yixin Lake
Longma Road
Huilong 6
← Lanjiagou
Wangcongci →
Huilong depot
Maojiawan Forest Park
Wenwuhui
Yong'an North
Yong'an

Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) is a rapid transit line in Chengdu. It starts at Huagui Road and ends at Huilong. The total length is 49.018 km (30.5 mi).

Line 5's color is purple. This line began construction on 14 September 2015,[1] was opened on 27 December 2019, from Huagui Road to Huilong.

Originally, the line was planned to use 6-car Type A rolling stock. However, anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential areas, the line was redesigned to allow for expansion to use 8-car Type A rolling stock.[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.[3][4]

  1. ^ 成都地铁5号线设41个站 2019年开通运营 [Chengdu Metro Line 5 str 41 stations To be opens in 2019] (in Chinese). Sichuan News. 21 May 2015. Retrieved 2015-07-04.
  2. ^ 成都地铁5号线将采用“8A”车辆编组 每列车定员2144人_网易新闻. 163.com news. Archived from the original on 2016-11-13. Retrieved 2018-07-04.
  3. ^ 成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都. cd.house.ifeng.com. Retrieved 2016-11-20.
  4. ^ "Sina Visitor System" 1号线太挤?“大肚子”5号线救急. 2018-04-18.