Line 5 (Guangzhou Metro)

Line 5
Line 5 train near Tanwei
Overview
Other name(s)L2 (5 lines plan name)
M3 (7 lines plan name)
M5 (2000 plan name)
Huanshilu line (环市路线)
StatusOperational
OwnerCity of Guangzhou
LocaleHuangpu, Tianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
Termini
Stations30
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[1]
Daily ridership1.18 million (2019 daily average)[2]
1.485 million (2019 Peak)[3]
History
Opened28 December 2009; 14 years ago (2009-12-28)
Technical
Line length41.7 km (25.91 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationThird rail, 1,500 V DC
(Overhead lines with same voltage installed in depot)
Route map

Huangpu New Port
Line reservation
Xiagang
Lujiao Creek
Baoying Dadao
 13  Left arrow to Xinsha
Huangpu New Port branch line
Xiayuan
 13 
Miaotou
Shuangsha Stabling Yard
Shuangsha
Wenchong
Dashadong
 7 
Dashadi
Huangpu Port branch line/  13  Left arrow to Chaoyang
Yuzhu
 13 
Yuzhu Depot/Yuzhu Stabling Yard (Line 13)
Sanxi
Dongpu
connection to Line 4
Chebeinan
 4 
Keyun Lu
Yuancun
 21  (  11  After 2024)
 21  Left arrow to Zengcheng Square (  11 
Left arrow anti-clockwise
clockwiseRight arrow
)
Tancun
Liede Creek
Liede
Zhujiang New Town
 3 
Wuyangcun (OSI to  10  Siyou Xinma Lu)
Yangji Stream
 10  Right arrow to Xilang
Yangji
 1 
 13  Left arrow to Xinsha
Zoo
Ouzhuang
 6 
Taojin (OSI to  12   13  Jianshe Liumalu)
Xiaobei
 11  Left arrow clockwise
Guangzhou Railway Station
 2   11   14   22 
 14  Left arrow to Dongfeng
 22 
Left arrow to Airport North (Terminal 2)
to Panyu Square Right arrow
Xicun
 8 
Xichang
 13 
 13  Left arrow to Chaoyang
Sima Creek
Zhongshanba
 11 
 11  Right arrow anti-clockwise
 6  UpperRight arrow to Xiangxue
Tanwei
 6 
connection to Line 6
 6  Down arrow to Xunfenggang
Jiaokou Bus interchange
Line 5
Simplified Chinese广州地铁5号线
Traditional Chinese廣州地鐵5號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Wǔ Hào Xiàn
Yue: Cantonese
Jyutpinggwong2zau1 dei6tit3 ng5 hou6 sin3

Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Jiaokou running 41.7 km (25.91 mi) in a wide "∩" shape and ends at Huangpu New Port. Like lines 4 and 6, it is equipped with linear induction motor technology. Line 5's color is red. Line 5 began operation on 28 December 2009, from Jiaokou to Wenchong.[4] On December 31, 2009, Line 5 set a record of 567,000 daily passengers, surpassing the ten year ridership projections in the span of just 4 days after its opening. As of May 2017, Line 5 carries an average of 1.05 million passengers per day and is extremely congested throughout the day, operating at over 100% capacity during rush hours.[5][6] The opening of Phase I of Line 13 further increased traffic demand on the west end of Line 5 and pushing congestion to over 130% capacity.[7] Prompting the Guangzhou Metro to limit passenger traffic at a number of subway stations on Line 5.[7] In 2018, the busiest section of Line 5 reaches over 50,000 pphpd of traffic volume during peak periods.[8] By 2019, the line was used by 1.18 million passengers each day.[2] In the future Line 13 Phase II will provide relief for Line 5. On 28 December 2023, the line was extended to the east from Wenchong to Huangpu New Port.[9]

  1. ^ "Guangzhou Metro - Railway Technology".
  2. ^ a b https://www.gzmtr.com/ygwm/gsgk/qynb/202106/P020210625600848762741.pdf [bare URL PDF]
  3. ^ 21号线开通后,6号线苏元站客流为何暴涨9倍?. 南方网. Retrieved 2022-05-13.
  4. ^ "广州地铁五号线开通试运营". 2009-12-28. Archived from the original on 2020-06-01.
  5. ^ 广州地铁五号线最小行车间隔压缩至2分06秒_金羊网新闻. news.ycwb.com. Retrieved 2017-07-08.
  6. ^ "广州日报数字报-地铁高峰时段燕塘至广州东最挤". 2018-04-09. Archived from the original on 2018-04-09. Retrieved 2020-05-10.
  7. ^ a b "广州地铁 全程为你--公司新闻". gzmtr.com. Retrieved 2020-05-10.
  8. ^ "详情". www.camet.org.cn. Retrieved 2022-12-20.
  9. ^ 广州地铁 (2023-12-27). "【开通官宣:#广州两条地铁新线开通#时间敲定】". weibo.com (in Chinese). Retrieved 2023-12-28.