Line 6 (Mumbai Metro)

Mumbai Metro Pink Line 6
Overview
StatusUnder construction
OwnerMMRDA
Line number6
LocaleMumbai, Maharashtra, India
Termini
Stations13
WebsiteLine 6
Service
TypeRapid transit
SystemMumbai Metro
Depot(s)Kanjurmarg
History
Planned opening2025 (2025)
Technical
Line length14.477 km (8.996 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Highest elevation38 m (125 ft)
Line 6 map

Line 6
Kanjurmarg Depot
0.000
Vikhroli EEH
Central line Left arrow Kalyan and CSMT Right arrow
0.9736
Kanjurmarg (West)
Gandhi Nagar (Kanjurmarg) on Line 4
2.6316
IIT Powai
3.6960
Powai Lake
4.5453
Rambaug (Powai)
5.5576
Saki Vihar Road
Aarey Colony on Line 3 - Aqua Line
Aarey Colony Ramp
SEEPZ on Line 3 - Aqua Line
6.6939
SEEPZ Village
7.8168
Mahakali Caves
9.3646
Shyam Nagar
10.3265
Jogeshwari East on Line 7 - Red Line
Western line Left arrow Dahanu Road and Churchgate Right arrow
11.4863
Jogeshwari (West)
12.4754
Adarsh Nagar
Lower Oshiwara on Line 2 - Yellow Line
13.2042
Swami Samarth Nagar (Lokhandwala)

Line 6 (Pink Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The 14.477 km (8.996 mi) elevated line will connect Lokhandwala Complex with Vikhroli and will have 13 stations.

Line 6 will also provide interchanges with Yellow Line 2 at Adarsh Nagar, with Aqua Line 3 at SEEPZ, with Green Line 4 at Kanjurmarg West, and with Red Line 7 at Jogeshwari Vikhroli Link Road. It also offers connectivity with the Mumbai Suburban Railway's Western line at Jogeshwari and with the Central line at Kanjurmarg.

Line 6 is expected to open by 2025.