32°48′51″N 73°57′31″E / 32.81417°N 73.95861°E
M-12 motorway | |
---|---|
ایم ١٢ موٹروے | |
Sambrial-Kharian Motorway | |
Route information | |
Maintained by National Highway Authority | |
Length | 69 km (43 mi) |
History | Under Construction |
Major junctions | |
East end | Sambrial |
West end | Kharian |
Location | |
Country | Pakistan |
Major cities | |
Towns | |
Villages | |
Highway system | |
The M-12 motorway (Urdu: موٹروے 12), or the Sambrial-Kharian motorway[1], is a motorway in Pakistan, under construction since July 2022.[2] M-12 will connect Sambrial to Kharian. The 69 km (43 mi) long motorway will have 5 interchanges, a service area, and a 1 km (0.62 mi) long bridge spanning River Chenab. The M-12 will be a four-lane motorway (expandable to six-lanes) with a design speed of 120 km/h (75 mph) and an expected completion time of 2 years.[2][3]