You can help expand this article with text translated from the corresponding article in Hungarian. (July 2019) Click [show] for important translation instructions.
|
M70 motorway | |
---|---|
M70-es autópálya | |
Route information | |
Part of E653 | |
Length | 21 km (13 mi) |
Major junctions | |
From | M7 near Letenye |
To | border with Slovenia → A5 |
Location | |
Country | Hungary |
Counties | Zala |
Highway system | |
|
The M70 motorway (Hungarian: M70-es autópálya) is a motorway in Hungary, connecting the M7 motorway to the A5 motorway in Slovenia.[1][2] The road is 21 km long and has a speed limit of 130 km/h. The last section was completed in 2006. After the opening of the last missing sections of the M7 on August 19, 2008, there is a direct motorway link from Budapest to Slovenia. The expressway originally consisted of two lanes between Letenye and Tornyiszentmiklós interchanges. As a four-lane, full profile motorway, it opened on December 13, 2019 (see the Hungarian article for references in Hungarian). It was built by the Colas Group.[3]