MRT Line 4 (Dhaka Metro Rail)

Mass Rapid Transit Line 4
Overview
Native nameম্যাস র‍্যাপিড ট্রানজিট লাইন ৪
StatusProposed
OwnerRoad Transport and Highways Division
LocaleGreater Dhaka, Bangladesh
Termini
Stations8
Colour on map     Dark Blue (#003DA5)
Service
TypeRapid transit
SystemDhaka Metro Rail
Operator(s)Dhaka Mass Transit Company Limited
Depot(s)Madanpur, Bandar Upazila
History
Planned openingDecember 2030
Technical
Line length16 kilometres (9.9 mi)
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail and 1,500 V DC overhead catenary
Operating speed100 km/h (62 mph)
Highest elevation13 metres (43 ft)
Route map

The MRT Line 4 (Bengali: এমআরটি লাইন ৪) of Dhaka Metro Rail is a proposed mass rapid transit line, stretching from the city's main railway station to the Bandar Upazila. This line is scheduled to be completed by 2030 and will be operated by the Dhaka Mass Transit Company Limited (DMTCL). South Korea has expressed interest to invest in this project.