M4 | |||
---|---|---|---|
Overview | |||
Status | Operational | ||
Locale | Milan, Italy | ||
Connecting lines | |||
Stations | 21 | ||
Website | Official website | ||
Service | |||
Type | Rapid transit | ||
System | Milan Metro | ||
Operator(s) | Azienda Trasporti Milanesi | ||
Rolling stock | Hitachi Rail Italy Driverless Metro | ||
Daily ridership | 40,000 (July 2023-February 2024)[1] | ||
History | |||
Opened | 26 November 2022 (first phase) | ||
Last extension | 12 October 2024 (full line) | ||
Technical | |||
Line length | 15.2 km (9.4 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 750 V DC third rail | ||
|
Line 4 is an underground rapid transit line in Milan, Italy, part of the Milan Metro. The line color is blue. The first section opened on 26 November 2022[2] and as of 2023 it is 7.3 km (4.5 mi) long with 8 stations.[3] The full line opened on 12 October 2024[3] The line is 15.2 km (9.4 mi) long with 21 stations.[4]
The line features automatic driverless trains[5] and is designed for a capacity of 24–28,000 passengers per hour in each direction.[6] The expected annual ridership is 87 million.
MT
was invoked but never defined (see the help page).