North-Link Line | |
---|---|
Overview | |
Native name | 北迴線 |
Owner | Taiwan Railways Administration |
Termini | |
Stations | 13 |
Service | |
Type | Passenger/freight rail |
Operator(s) | Taiwan Railways Administration |
History | |
Opened | 1 February 1980 |
Technical | |
Line length | 79.2 km (49.2 mi) |
Number of tracks | 2 |
Track gauge | 3 ft 6 in (1,067 mm) |
Electrification | 25 kV/60 Hz Catenary |
Operating speed | 150 km/h (93 mph) |
The North-Link Line (Chinese: 北迴線; pinyin: Běihuí Xiàn) is the central section of the Eastern Line of the Taiwan Railways Administration. The length of its mainline is 79.2 km, and there is a 7.4 km long branch between Beipu and Hualien Port.[1]