Overview | |
---|---|
Line | Midland Line |
Location | Southern Alps, South Island, New Zealand |
Coordinates | North (West coast) portal: 42°51′45″S 171°32′55″E / 42.8625°S 171.5487°E East (Canterbury) portal: 42°56′21″S 171°33′47″E / 42.9392°S 171.5630°E |
Start | Otira, West Coast |
End | Arthur's Pass Canterbury |
Operation | |
Opened | 4 August 1923 |
Operator | KiwiRail, The Great Journeys of New Zealand |
Character | Single bore rail tunnel |
Technical | |
Line length | 8566 m |
Track gauge | 1067 mm (3' 6") |
The Otira Tunnel is a railway tunnel on the Midland Line in the South Island of New Zealand, between Otira and Arthur's Pass. It runs under the Southern Alps from Arthur's Pass to Otira – a length of over 8.5 kilometres (5.3 mi). The gradient is mainly 1 in 33, and the Otira end of the tunnel is over 250 m (820 ft) lower than the Arthur's Pass end.