Pujiang line

Pujiang line
A Pujiang line metro car
Overview
Other name(s)M8s;
Phase 3 of Shanghai Metro line 8 (planned name)
Native name上海地铁浦江线
abbreviated: 浦江线
StatusOperational
OwnerShanghai Rail Transit Line 8 Phase III Development Co., Ltd.
LocalePujiang, Minhang districts, Shanghai, China
Termini
Connecting lines 8 
Stations6
Websitewww.shmetro.com
Service
TypeRubber-tyred metro
SystemShanghai Metro Shanghai Metro
ServicesShendu HighwayHuizhen Road
Operator(s)Shanghai Keolis Public Transport Operation Management Co. Ltd.
Depot(s)Pujiang town depot
Rolling stock11 Bombardier Innovia APM 300[1] 4-car trains[2]
Daily ridership41,600 (3 November 2021, peak)
31,700 (2021, average)[3]
History
CommencedDecember 25, 2015; 8 years ago (2015-12-25)
OpenedMarch 31, 2018; 6 years ago (2018-03-31)
Technical
Line length6.689 km (4.16 mi)
Number of tracks2
CharacterElevated
Electrification750 V DC third rail
Operating speed80 km/h (50 mph)[1]
Average speed: 36 km/h (22 mph)
SignallingGoA4 / UTO
Bombardier CITYFLO 650 CBTC
Route map

The Pujiang line of Shanghai Metro (simplified Chinese: 上海轨道交通浦江线; traditional Chinese: 上海軌道交通浦江線; pinyin: Shànghǎi Guǐdào Jiāotōng Pǔjiāng Xiàn) is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang. It was originally conceived as phase 3 of Shanghai Metro line 8, but afterwards was constructed as a separate line, connecting with line 8 at its southern terminus, Shendu Highway.[4] The line opened for passenger trial operations on March 31, 2018.[5][6][7] It is the first automated, driverless people mover line in the Shanghai Metro, and has 6 stations with a total length of 6.689 kilometres (4.156 mi).[4][6] The people mover was expected to carry 73,000 passengers a day.[8] The line is colored grey on system maps.

The line is operated by Shanghai Keolis Public Transport Operation & Management Co. Ltd. (Chinese: 上海申凯公共交通运营管理有限公司), a joint venture owned by Keolis and Shanghai Shentong Metro Group for at least five years after opening.[9][10]

  1. ^ a b "Bombardier delivers automated people mover to Shanghai Shentong Metro". www.eurotransportmagazine.com. Retrieved 2017-02-21.
  2. ^ 闵行 无人驾驶的浦江线年底将试运营,杜行、鲁汇地区交通出行将更便捷. jfdaily.com (in Chinese). Retrieved 2017-12-28.
  3. ^ "上海申通地铁股份有限公司 2021 年年度股东大会材料". Shanghai Shentong Metro Co., Ltd.
  4. ^ a b 轨交8号线三期取名“浦江线” 将与沈杜公路站接驳_大申网_腾讯网. sh.qq.com (in Chinese (China)).
  5. ^ 17号线、9号线三期、浦江线进入全线运营跑图演练--上海频道--人民网. sh.people.com.cn (in Chinese).
  6. ^ a b 注意!轨交浦江线预计明年一季度开通试运营!. news.163.com (in Chinese (China)). (Notice: Pujiang Line to begin trial operations in first quarter of 2018.)
  7. ^ 全自动无人驾驶!浦江线3月31日通车 全天运营约17小时. CNR.cn (in Chinese (China)).
  8. ^ Driverless peoplemover opens in Shanghai
  9. ^ "Shanghai metro line 8 phase 3 | Shanghai Keolis". shkeolis.com. Archived from the original on 2020-08-10. Retrieved 2017-11-09.
  10. ^ "Shanghai Keolis: Who We Are". shkeolis.com. Archived from the original on 2018-03-28. Retrieved 2018-03-27.