Rodanthe Bridge

Rodanthe Bridge
The Rodanthe Bridge on the date of its opening, 2022
Coordinates35°37′N 75°29′W / 35.61°N 75.48°W / 35.61; -75.48
CarriesTwo lanes of NC 12
CrossesPamlico Sound
LocaleRodanthe, NC
Characteristics
DesignTrestle
History
DesignerRK&K
Constructed byFlatiron Construction Corp.
Construction startSeptember 6, 2018
Construction cost$145 million
OpenedJuly 28th, 2022
Location
Map

The Rodanthe Bridge, commonly called the Jug Handle Bridge,[1] is a 2.4-mile-long (3.9 km) two-lane "jug handle" trestle bridge in Dare County, North Carolina. The bridge carries North Carolina Highway 12 from Rodanthe to the southern point of Pea Island National Wildlife Refuge by going west into the Pamlico Sound and then parallel an area of the Hatteras Island that is prone to coastal erosion, washouts, and flooding from storms.[2]

The bridge is designed around climate resilience in mind using nature-based design practices to try to make the bridge more resilient to extreme weather.[3]

  1. ^ Crist, Joy (2020-09-03). "Jug Handle Bridge is nearly 50% complete, and is still expected to open in the fall of 2021". Island Free Press. Archived from the original on 2020-09-06. Retrieved 2021-02-13.
  2. ^ "N.C. 12 Rodanthe Bridge". Flatiron Construction Corp. Archived from the original on July 5, 2019. Retrieved July 5, 2019.
  3. ^ "Shoring Up for Rising Sea Levels". Engineering News Record. Archived from the original on 2021-12-01. Retrieved 2021-01-03.