SR Leader class

SR/BR Leader class[1]
A side-and-front view of an 0-6-0+0-6-0 tank steam locomotive travelling towards the cameraman. The locomotive is a cuboid that contains boiler, fuel and cabs. The cuboid sits on two 0-6-0 bogies. It is hauling a train of around seven carriages past a signal box in the background.
Leader locomotive 36001 with test train at Oxted
Type and origin
Power typeSteam
DesignerOliver Bulleid
BuilderSR Brighton Works
Build date1946–1949
Total produced5 (only one completed)
Specifications
Configuration:
 • Whyte0-6-0+0-6-0T
 • UICC′C′ h6t
Gauge4 ft 8+12 in (1,435 mm) standard gauge
Driver dia.5 ft 1 in (1.549 m)
Length67 ft (20.42 m)
Loco weight150 long tons (168 short tons; 152 tonnes)
Fuel typeCoal
Fuel capacity4 long tons (4.5 short tons; 4.1 tonnes)
Water cap.4,000 imp gal (18,000 L; 4,800 US gal)
Firebox:
 • Grate area25.5 sq ft (2.37 m2)
Boiler pressure280 lbf/in2 (1.93 MPa)
CylindersSix (Three in each bogie)
Cylinder size12+14 in × 15 in (311 mm × 381 mm)
Valve gearBulleid chain driven valve gear
Performance figures
Tractive effort26,300 lbf (116.99 kN)
Career
Operators
ClassSR / BR: Leader
Power classSR / BR: Unknown
LocaleSouthern Region
Withdrawn1951
DispositionAll scrapped

The Leader was a class of experimental 0-6-0+0-6-0T steam locomotive, produced in the United Kingdom to the design of the innovative engineer Oliver Bulleid. The Leader was an attempt to extend the life of steam traction by eliminating many of the operational drawbacks associated with existing steam locomotives. It was intended as a replacement for the ageing fleet of M7 class tank engines still in operation on the Southern Railway (SR).[2] Design work began in 1946 and development continued after the nationalisation of the railways in 1948, under the auspices of British Railways (BR).

The Leader project was part of Bulleid's desire to modernise the steam locomotive based on experience gained with the Southern Railway's fleet of electric stock.[2] Bulleid considered that attitudes towards the labour-intensity of steam operation had changed during the post-war period, favouring dieselisation and electrification. In an effort to demonstrate the continued potential of steam, Bulleid pushed forward the boundaries of steam-power, hoping it could compete with diesel and electric locomotives in terms of labour-saving and ease of operation.[3]

The design incorporated many novel features, such as the use of thermic siphons, bogies and cabs at either end of the locomotive, resulting in its unique—for a steam locomotive—modern diesel-like appearance. Several of its innovations proved to be unsuccessful however, partly accounting for the project's cancellation in the early 1950s. Five Leader locomotives were started, although only one was completed. The operational locomotive was trialled on the former Southern Railway network around Brighton. Problems with the design, indifferent reports on performance and political pressure surrounding spiralling development costs, led to all locomotives of the class being scrapped by 1951.

  1. ^ Bulleid (1977, p. 143)
  2. ^ a b Bulleid (1977, p. 135)
  3. ^ Cite error: The named reference Day-Lewis was invoked but never defined (see the help page).