General information | |||||
---|---|---|---|---|---|
Location | Sugihwaras, Saradan, Madiun Regency East Java Indonesia | ||||
Coordinates | 7°32′51″S 111°43′56″E / 7.54750°S 111.73222°E | ||||
Elevation | +107 m (351 ft) | ||||
Operated by | Kereta Api Indonesia | ||||
Line(s) | Solo Balapan–Kertosono | ||||
Platforms | 1 side platform 2 island platforms | ||||
Tracks | 4 | ||||
Construction | |||||
Structure type | Ground | ||||
Parking | Available | ||||
Accessible | Available | ||||
Other information | |||||
Station code | SRD | ||||
Classification | Third-class station | ||||
History | |||||
Rebuilt | 30 April 2019 | ||||
|
Saradan Station (station code: SRD) is a third-class railway station in Sugihwaras, Saradan, Madiun Regency, East Java, Indonesia, operated by Kereta Api Indonesia.[1] This railway station is at the most eastern railway station in Madiun Regency. This station's new building is operated—which has four tracks (two main lines and two passing tracks)—since Nganjuk–Babadan double track segment activation on 30 April 2019.[2]
Before Bagor railway station, there is Wilangan railway station that has been deactivated since the double-track activation.[3]