3°10′24″N 101°41′44″E / 3.173296°N 101.695555°E
AG3 SP3 MR11 PY17 CC08 Titiwangsa | |||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LRT, MRT and Monorail station | |||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||
Other names | Chinese: 蒂蒂旺沙站 | ||||||||||||||||||||||||||||||||||
Location | Jalan Tun Razak, Kuala Lumpur Malaysia | ||||||||||||||||||||||||||||||||||
Coordinates | 3°10′23″N 101°41′43″E / 3.17306°N 101.69528°E | ||||||||||||||||||||||||||||||||||
Owned by | Prasarana Malaysia (LRT & Monorail) MRT Corp (MRT) | ||||||||||||||||||||||||||||||||||
Operated by | Rapid Rail | ||||||||||||||||||||||||||||||||||
Line(s) | 3 Ampang 4 Sri Petaling 8 KL Monorail 12 Putrajaya 13 Circle (Proposed) | ||||||||||||||||||||||||||||||||||
Platforms | 2 side platforms (LRT) 2 side platforms (Spanish solution) (Monorail) 1 island platform (MRT) | ||||||||||||||||||||||||||||||||||
Tracks | 2 (LRT) 1 (Monorail) 2 (MRT) | ||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||
Structure type | AG3 SP3 MR11 CC08 (Elevated) PY17 (Underground) | ||||||||||||||||||||||||||||||||||
Platform levels | 4 | ||||||||||||||||||||||||||||||||||
Parking | Not available | ||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||
Station code | AG3 SP3 MR11 PY17 CC08 | ||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||
Opened | 6 December 1998[1] 31 August 2003 (Monorail) 16 March 2023 (MRT) | (LRT)||||||||||||||||||||||||||||||||||
Opening | 2028-2030 (Circle Line) | ||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||
|
Titiwangsa station is a rapid transit interchange station in Kuala Lumpur, Malaysia. The station is served by the LRT Ampang and Sri Petaling Lines, the KL Monorail Line and the MRT Putrajaya Line. The station allows seamless physical and fare integration between the four train lines.
Situated on Jalan Tun Razak (English: Tun Razak Road, formerly Circular Road) in the subdistrict of Titiwangsa, the station is also located beside the Gombak River and an adjoining bus station known as Titiwangsa Sentral.
The station is planned to be an interchange with the Circle Line of the KVMRT project.[2]