Trinity Islands | |
---|---|
General information | |
Status | Building D2: under construction |
Type | Residential |
Location | Water Street, Manchester, England, United Kingdom |
Construction started | 2022 |
Estimated completion | 2026 |
Cost | £535 million |
Height | |
Roof | Building D1: 183 m (600 ft) Building D2: 169 m (554 ft) Building C2: 146 m (479 ft) Building C1: 119 m (390 ft) |
Technical details | |
Floor count | Building D1: 60 Building D2: 55 Building C2: 48 Building C1: 39 |
Design and construction | |
Architect(s) | SimpsonHaugh |
Developer | Renaker |
Structural engineer | WSP |
Other information | |
Number of units | 1,950 |
Trinity Islands is a residential skyscraper cluster under construction in Manchester, England, consisting of four towers between 39 and 60 storeys split over two 2.2-acre (0.89 ha) sites: Building D1 at 183 metres (600 ft), Building D2 at 169 m (554 ft), Building C2 at 146 m (479 ft) and Building C1 at 119 m (390 ft).[1][2] The project was designed by SimpsonHaugh and comprises 1,950 apartments, with a total build cost of £535 million.[1][3]