Changi Airport MRT station is an underground Mass Rapid Transit (MRT) station in Changi, Singapore. The station directly connects to Terminal 2 and Terminal 3 of Changi Airport and serves other airport amenities. Glass atrium walls at the ends of the station support an illuminated bridge that spans the island platform while allowing maximum sunlight into the station. A rail connection to the airport had been planned in the 1980s but these plans were shelved due to the low financial viability of such a branch. With increased air traffic to Changi Airport and the proposal of Terminal 3 in 1994, the plans were revived, and finalised in 1996. Construction for the line began in 1998. The station opened on 8 February 2002 with lower passenger demand than expected, but it continues to provide an alternative transport option to the airport. In May 2019 it was announced that the station would be incorporated into the Thomson–East Coast Line by 2040 as it extends to the airport's Terminal 5. (Full article...)