Xuzhou Metro | |||
---|---|---|---|
Overview | |||
Native name | 徐州地铁 | ||
Owner | Xuzhou Metro Group | ||
Locale | Xuzhou, Jiangsu, China | ||
Transit type | Rapid transit | ||
Number of lines | 3 (another 4 lines under construction) | ||
Line number | 1 2 3 | ||
Number of stations | 54 | ||
Daily ridership | 256,700 (31 December 2020 record) | ||
Annual ridership | 7.5 million (2019) | ||
Website | http://xzgdjt.com/ | ||
Operation | |||
Began operation | 28 September 2019[1] | ||
Operator(s) | Xuzhou City Rail Transit Co., Ltd. | ||
Character | Underground, elevated | ||
Number of vehicles | 72 | ||
Technical | |||
System length | 64.347 km (39.983 mi)[2] | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 1.5 kV DC overhead lines | ||
|
The Xuzhou Metro (Chinese: 徐州地铁; pinyin: Xúzhōu dìtiě) is a rapid transit system in Xuzhou, Jiangsu Province, China. Construction began in February 2014, and Line 1 was opened on September 28, 2019,[1] Line 2 was opened on November 28, 2020, and Line 3 was opened on June 28, 2021.
By 2020, the network is scheduled to comprise three lines with a total length of about 67 kilometres (42 mi). The total investment is expected to be 44.3 billion renminbi.[3][4] The system is planned to comprise 11 lines and 323 kilometres (201 mi) of track when fully built out.[5]
In its first year of operation the ridership was 7.5 million (2019).