Yellow Line (Bangkok)

MRT Yellow Line
สายสีเหลือง
A Bombardier Innovia Monorail 300 at Bang Kapi station
Overview
Other name(s)MRT Nakkara Phiphat Line
Native nameรถไฟฟ้าสายสีเหลือง
รถไฟฟ้าสายนัคราพิพัฒน์
StatusOperational
OwnerMass Rapid Transit Authority of Thailand
LocaleBangkok and Samut Prakan, Thailand
Termini
Stations23
Websitehttps://mrta-yellowline.com
Service
TypeMonorail
SystemMetropolitan Rapid Transit
Operator(s)Eastern Bangkok Monorail Company Limited
(Subsidiary of BSR Consortium)
Depot(s)Si Iam Depot
Rolling stockAlstom Innovia Monorail 300
28 four-cars trains
Daily ridership48,035 (30 August 2024)[1]
History
Opened3 July 2023; 16 months ago (2023-07-03)
Technical
Line length28.62 kilometers (17.78 mi)
CharacterFully elevated
Electrification750 V DC
Operating speed80 km/h (50 mph)
SignallingBombardier CITYFLO 650 moving block CBTC ATC under ATO GoA 4 (Fully Automated Train Control), with subsystems of ATP, ATS and CBI[2]
Route map

Lat Phrao
 MRT 
Phawana
Chok Chai 4
Lat Phrao 71
Lat Phrao 83
Mahat Thai
Lat Phrao 101
Bang Kapi
Yaek Lam Sali
 MRT 
Si Kritha
Hua Mak
Kalantan
Si Nut
Srinagarindra 38
Suan Luang Rama IX
Si Udom
Debaratana-Si Iam
Maintenance Center
Si Iam
Si La Salle
Si Bearing
Si Dan
Si Thepha
Thipphawan
Samrong
 BTS 
A typical ticket office of the Yellow Line
Fare gates in Si Kritha Station
A ticket vending machine in a Yellow Line station
Signage at Hua Mak Station
A typical Yellow Line platform level at Si La Salle (YL18)

The MRT Yellow Line (Thai: รถไฟฟ้ามหานคร สายสีเหลือง) or MRT Nakkhara Phiphat Line (Thai: รถไฟฟ้ามหานคร สายนัคราพิพัฒน์) is an elevated monorail line in Bangkok and Samut Prakan Province, Thailand, part of the MRT rapid transit system. The 28.62 km (17.78 mi) line has 23 stations and cost 55 billion baht.[3] The line was originally proposed in 2005 by the Office of Transport and Traffic Policy and Planning to be a heavy rail underground line along Lat Phrao road which was then elevated from Lam Sali Intersection to Samrong. However, it was decided in 2012 to build an elevated monorail line for the whole length in order to reduce construction costs.

The Yellow Line provides mass transit along the heavily congested Lat Phrao Road and Srinagarindra Road corridors. The line links 6 other lines; the MRT Blue Line, interchange with the MRT Orange Line (which is under construction), the planned MRT Grey Line and MRT Brown Line, the Airport Rail Link (Bangkok) and finally the BTS Sukhumvit Line. As such, it is an important cross city link in the middle north-eastern and eastern areas of Bangkok.

Preliminary site works began in late 2017 with major construction work starting from March 2018. In October 2020, the BSR stated that they plan to open the first section of the Yellow Line by October 2021 with initial operations running from Samrong to Si Iam.[4] The line was then planned to fully open in July 2022.[5] However, due to COVID-19 outbreaks in Bangkok delaying construction with sites closed, the BSR stated that the first section of the line would not open until July 2022.[6] On 29 November 2021, daily testing began on a 6 km (3.7 mi) section of the line between the depot at Si Iam and Srinagarindra 38 station. Testing was expanded after a 3-month period.[6]

In mid-April 2022, the Director of EBM/BSR, Mr Surapong Laoha-Unya, stated that further labour & installation delays would mean that the line would now not open until September 2022.[7] Construction had progressed to 99.02% as of the end of April 2023.[8]

After repeated delays, the line partially opened to the public for free trial rides on 3 June 2023 from Hua Mak to Samrong,[9] having done a private trial ride between Kalantan and Samrong for the press the day before. Trial rides for Phawana to Hua Mak section began on 12 June,[10] while the final section between Phawana and Lat Phrao station opened on 19 June.[11][12]

Rabbit Card or EMV credit cards are accepted on the MRT Yellow Line, although pricing is yet to be determined.[12]

  1. ^ ""กรมการขนส่งทางราง" เผยวันศุกร์สิ้นเดือนสิงหาคม 67 มีผู้ใช้บริการรถไฟฟ้าสายฉลองรัชธรรม (สีม่วง) และรถไฟฟ้าสายสีแดง สูงสุดตั้งแต่เปิดให้บริการมา หลังมีนโยบายอัตราค่าโดยสารรถไฟฟ้าสูงสุด 20 บาทตลอดสาย". กรมการขนส่งทางราง กระทรวงคมนาคม (in Thai). 2024-08-31. Retrieved 2024-09-04.
  2. ^ "Alstom's automated Innovia monorail system enters service in Bangkok". Archived from the original on 2023-09-11.
  3. ^ "MRTA Yellow Line project". Archived from the original on 2023-09-11.
  4. ^ "เปิดไทม์ไลน์-ค่าตั๋ว รถไฟฟ้าไร้คนขับ "สายสีชมพู-เหลือง"". Prachachat. 1 October 2020.
  5. ^ Theparat, Chatrudee (30 October 2020). "Tangled lines". Bangkok Post. Retrieved 31 October 2020.
  6. ^ a b "วิ่งทดสอบฉลุย! โมโนเรล 'สายสีเหลือง' ทำความเร็ว 80 กม./ชม. พร้อมบริการกลางปี 65". Manager Online. 30 November 2021.
  7. ^ "วันสงกรานต์..สาดความสดใส โมโนเรลชมพู&เหลืองได้นั่งส.ค.น." Dailynews. 13 April 2022.
  8. ^ "อัปเดตความคืบหน้าการก่อสร้าง ประจำเดือนเมษายน 2566". 8 May 2023.
  9. ^ "รฟม. เชิญชมภาพบรรยากาศ การเดินรถเสมือนจริง (Trial Run) รถไฟฟ้ามหานคร สายสีเหลือง รอบสื่อมวลชนค่ะ". 2 June 2023.
  10. ^ "รฟม. ขยายเส้นทางเปิดทดสอบการเดินรถเสมือนจริง (Trial Run) รถไฟฟ้ามหานคร สายสีเหลือง ตั้งแต่วันที่ 12 มิถุนายน นี้ เป็นต้นไป จากสถานีภาวนา ถึง สถานีสำโรง ระหว่างเวลา 06.00 น. – 20.00 น." www.mrta.co.th (in Thai). Retrieved 2023-06-09.
  11. ^ "Prayut to preside over official Yellow Line opening". Bangkok Post. Retrieved 2023-06-08.
  12. ^ a b "Prayut tries out Bangkok's new monorail". Bangkok Post. Retrieved 2023-06-19.