This article needs to be updated.(June 2024) |
Yellow Line | |
---|---|
Overview | |
Status | Under construction |
Locale | Indore, Madhya Pradesh, India |
Termini |
|
Stations |
|
Service | |
Type | Rapid transit |
System | Indore Metro |
Operator(s) | Madhya Pradesh Metro Rail Corporation Limited |
Rolling stock | Alstom[1] |
Technical | |
Line length | 33.53 km (20.83 mi) (Planned) 16.21 km (10.07 mi) (Under construction) 17.32 km (10.76 mi) (Approved) |
Character | Elevated & Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 750 V DC third rail |
Operating speed |
|
The Yellow Line (Hindi: येल्लो लाइन) is an under-construction metro rail line of the Indore Metro, a rapid transit system in Indore, Madhya Pradesh, India. This line consists of 29 metro stations from Gandhi Nagar to Airport with a total distance of 33.53 km. However the priority section from Gandhi Nagar to Radisson Square is under-construction with a distance of 16.21 km and it is expected to be operational in March 2024.[2][3]