Overview | |
---|---|
Line | Gotthard Line |
Location | Zürich, Switzerland |
Coordinates | 47°19′40″N 8°31′52″E / 47.3277°N 8.5312°E |
Status | Active since 2003 |
System | Swiss Federal Railways (SBB CFF FFS) |
Start | Zürich |
End | Thalwil |
Operation | |
Opened | April 2003[1] |
Owner | SBB Infrastructure |
Operator | SBB CFF FFS |
Traffic | Railway |
Character | Passenger and freight |
Technical | |
Length | 9.4 km (5.8 mi)[2] |
No. of tracks | 2[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) (standard gauge) |
Electrified | 15 kV 16.7 Hz |
Operating speed | 160 km/h (99 mph) |
The Zimmerberg Base Tunnel (ZBT) is a railway tunnel under the Zimmerberg mountains in Switzerland. Phase I of the tunnel was opened to traffic during April 2003.
The ZBT has been divided into two phases of work; as of 2024, only Phase I is operational while Phase II remains in the planning and preparation stages. Zimmerberg I is about 10 km long; it links Zürich with Thalwil, bypassing a section of the Lake Zürich left-bank railway line, which allows rail traffic to traverse the mountains more efficiently.