2020 Sri Lankan blackouts

The 2020 Sri Lankan blackouts were a series of electrical blackouts that occurred on 17 August 2020, beginning around 12.30 pm SLST (UTC+5:30) and lasting over seven hours. The nationwide blackouts occurred due to a transmission technical failure at the Kerawalapitiya Grid-Sub station.[1][2][3] The Ministry of Power appointed a special committee to investigate the root cause behind the blackout.[4]

  1. ^ "Sri Lanka plunged into darkness as power outage hits entire nation". The New Indian Express. Retrieved 17 August 2020.
  2. ^ "Island-wide Power Cut due to an issue in the transmission system". Sri Lanka News - Newsfirst. 17 August 2020. Retrieved 17 August 2020.
  3. ^ "Electricity supply island-wide was disrupted". Daily News. Retrieved 17 August 2020.
  4. ^ Weerasooriya, Sahan. "Committee appointed to probe unexplained power cut". Retrieved 18 August 2020.