ABS-CBN Soundstage (Horizon IT Park) | |
---|---|
Alternative names | Horizon IT Park |
General information | |
Status | Operational (Parts of the area are still unfinished, including the second soundstage and the rest of Horizon IT Park) |
Type | Studio, soundstage, broadcasting, production facility, back lots, storage, visitors center, post production facility, offices, support building |
Architectural style | Modern |
Location | Igay Road, San Jose del Monte, Bulacan |
Country | Philippines |
Coordinates | 14°48′25.7″N 121°05′12.5″E / 14.807139°N 121.086806°E |
Current tenants | ABS-CBN Studios (Entertainment division) ABS-CBN Films (Film production division) |
Construction started | May 2017 (Phase 1A; the second soundstage under Phase 1B is still under construction) |
Construction stopped | December 2018 (Phase 1A) (Parts of the area are still unfinished, including the second soundstage and the rest of Horizon IT Park) |
Opening | December 12, 2018 (Phase 1A) |
Inaugurated | December 12, 2018 (Phase 1A) |
Cost | ₱ 700 Million (Estimated for Phase 1A) ₱ 6 to 7.5 Billion (Horizon IT Park with 10 Soundstages, projected) |
Owner | ABS-CBN Corporation |
Landlord | ABS-CBN Studios, Inc. |
Height | 30 ft (9.1 m) |
Technical details | |
Floor count | 2 floors (support building; first floo is the mezzanine floor and second floor is the elevation floor) |
Floor area | 1,500 m (4,900 ft) |
Grounds | 7.7 hectares (19 acres) |
Design and construction | |
Architecture firm | Bastien and Associates (California), AIDEA (Philippines), with consultants from Hollywood-based Manhattan Beach Studios |
Other designers | Manhattan Beach Studios (Consultants) |
Other information | |
Number of rooms | 40 rooms (support building; including restrooms, wardrobes and offices and facilities. Some still unassigned as of 2018) |
The ABS-CBN Soundstage at the Horizon IT Park, San Jose del Monte, Bulacan, is the main production facility of ABS-CBN.[1] It is owned by ABS-CBN Corporation, and operated and managed by ABS-CBN Studios, Inc.
Although the original plan is to have a total of 10 soundstages with 2 stages each, only 1 soundstage with 2 stages have been completed as of 2018. No announcements have been made as of 2021 regarding the construction of the other soundstages.
The area also includes parking spaces, storage, visitors center, offices and other facilities. The cost of the project is estimated to be between ₱6 and 7.5 billion.[1]