KD01 KJ17 Abdullah Hukum | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Commuter rail and LRT station | |||||||||||||||||||||
General information | |||||||||||||||||||||
Location | Jalan Bangsar, Kampung Haji Abdullah Hukum, Kuala Lumpur, Malaysia. | ||||||||||||||||||||
Coordinates | 3°7′7″N 101°40′22″E / 3.11861°N 101.67278°E | ||||||||||||||||||||
Owned by | Prasarana Malaysia (operated by Rapid Rail) Keretapi Tanah Melayu | ||||||||||||||||||||
Line(s) | 2 Tanjung Malim-Port Klang 5 Kelana Jaya | ||||||||||||||||||||
Platforms | 2 side platforms | ||||||||||||||||||||
Tracks | 2 (LRT) 3 (KTM Komuter) | ||||||||||||||||||||
Connections | Pedestrian bridge to KB01 Mid Valley KL Eco City and Mid Valley City | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | KJ17 Elevated KD01 At-grade | ||||||||||||||||||||
Parking | Not available | ||||||||||||||||||||
Accessible | Available | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | KD01 KJ17 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 1 September 1998 (LRT) 28 October 2018 (KTM Komuter) | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Abdullah Hukum station is an integrated rapid transit station in Kuala Lumpur, Malaysia, served by both the LRT Kelana Jaya Line and the KTM Komuter Port Klang Line.
The station consists of the elevated LRT station was opened first on 1 September 1998, together with a ground level KTM Komuter station which was constructed later as part of the KL Eco City development and physically integrated with the LRT station. The KTM Komuter station began operations on 28 October 2018.[1]