This article needs to be updated.(April 2019) |
Airport T1 Aeroport T1 | |||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
TMB rapid transit station | |||||||||||||||||||||||||
General information | |||||||||||||||||||||||||
Location | Barcelona–El Prat Airport 08820 El Prat de Llobregat Catalonia Spain | ||||||||||||||||||||||||
Coordinates | 41°17′22.7″N 2°04′26.0″E / 41.289639°N 2.073889°E | ||||||||||||||||||||||||
Owned by | Ifercat | ||||||||||||||||||||||||
Operated by | Transports Metropolitans de Barcelona (TMB) | ||||||||||||||||||||||||
Line(s) | Barcelona Metro line 9 | ||||||||||||||||||||||||
Platforms | 1 island platform | ||||||||||||||||||||||||
Tracks | 2 | ||||||||||||||||||||||||
Connections |
| ||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||
Structure type | Underground | ||||||||||||||||||||||||
Parking | Several airport parking garages serving Barcelona–El Prat Airport's terminal T1 are located nearby. | ||||||||||||||||||||||||
Accessible | The station is fully handicap-accessible. | ||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||
Station code | 901 | ||||||||||||||||||||||||
Fare zone | 1 (ATM Àrea de Barcelona) | ||||||||||||||||||||||||
History | |||||||||||||||||||||||||
Opening | 12 February 2016 | ||||||||||||||||||||||||
Services | |||||||||||||||||||||||||
|
Airport T1 (Catalan: Aeroport T1) is a Barcelona Metro station that serves terminal T1 of Barcelona–El Prat Airport, in the municipality of El Prat de Llobregat, to the southwest of Barcelona. It is the southern terminus of the airport branch of Barcelona Metro line 9 (L9) and is operated by Transports Metropolitans de Barcelona (TMB).
Opened in 2016, the station is located underneath the airport terminal and consists of two levels. The trains run on the lower level, where there is a 16-metre (52 ft) island platform featuring screen doors. Adjacent to the station is a depot that can accommodate 12 trains.[1] A new commuter rail link is projected to reach the station around 2018.[needs update]