Bajgora Wind Farm | |
---|---|
Official name | Parku i Erës Bajgora |
Country | Kosovo |
Location | Bajgorë, Mitrovica |
Coordinates | 42°58′14″N 21°0′53″E / 42.97056°N 21.01472°E |
Status | Operational |
Construction cost | EUR 157 million |
Wind farm | |
Type | Onshore |
Hub height | 110 m |
Rotor diameter | 137 m |
Power generation | |
Units operational | 27 x 3.8 MW |
Make and model | General Electric Energy 3.8-137 |
Nameplate capacity | 102.6 MW |
Annual net output | 320 GWh |
External links | |
Commons | Related media on Commons |
The Bajgora Wind Farm (Albanian: Parku i Erës Bajgora) is the largest wind farm in Kosovo. It has a nameplate capacity of 102.6 MW and it is estimated to have a total annual output of 320 GWh, while the system is designed to be operated for at least 25 years.[1]