StatusOperational
Construction costEUR 157 million
Wind farm
TypeOnshore
Hub height110 m
Rotor diameter137 m
Power generation
Units operational27 x 3.8 MW
Make and modelGeneral Electric Energy 3.8-137
Nameplate capacity102.6 MW
Annual net output320 GWh
External links
CommonsRelated media on Commons

The Bajgora Wind Farm (Albanian: Parku i Erës Bajgora) is the largest wind farm in Kosovo. It has a nameplate capacity of 102.6 MW and it is estimated to have a total annual output of 320 GWh, while the system is designed to be operated for at least 25 years.[1]

  1. ^ Todorović, Igor (2021-09-03). "First part of Bajgora wind power plant starts trial operation". Balkan Green Energy News. Retrieved 2023-06-03.