Block Island Wind Farm

Block Island Wind Farm
Aerial view
Map
Country
  • United States
LocationNew Shoreham, Rhode Island
Coordinates41°06′53″N 71°31′16″W / 41.1147°N 71.5211°W / 41.1147; -71.5211
StatusOperational
Construction began2015
Commission date12 December 2016[1]
Construction cost$290 million
Wind farm
Type
Distance from shore3.8 mi (6.1 km)
Hub height100 m[2]
Rotor diameter
  • 150 m (490 ft)
Rated wind speed3–25 m/s[3]
Power generation
Units operational5 × 6 MW
Make and modelGE Renewable Energy Haliade 150-6MW (5)
Nameplate capacity
  • 30 MW
Capacity factor47.6% (projected)[4]
Annual net output125 GW·h
External links
Websiteus.orsted.com/renewable-energy-solutions/offshore-wind/block-island-wind-farm
CommonsRelated media on Commons

Block Island Wind Farm was the first commercial offshore wind farm in the United States,[5] located 3.8 mi (6.1 km) from Block Island, Rhode Island in the Atlantic Ocean. The five-turbine, 30 MW project was developed by Deepwater Wind, now known as Ørsted US Offshore Wind.

Construction began in 2015, and in late summer 2016, five Alstom Haliade 150-6MW turbines were erected. Operations were launched in December 2016.[4] It is the largest project using wind power in Rhode Island.

  1. ^ "Block Island Wind Farm begins commercial operations". Deepwater Wind. 2016-12-12. Archived from the original on 2022-10-17. Retrieved 2016-12-17.
  2. ^ "HALIADE* 150-6MW OFFSHORE WIND TURBINE". gerenewableenergy.com. Archived from the original on 2017-01-28. Retrieved 2017-03-02.
  3. ^ "Alstom Haliade 150 - 6.000,0 kW - Turbine". en.wind-turbine-models.com. Archived from the original on 2017-03-21. Retrieved 2017-03-20.
  4. ^ a b "Alstom announces a major milestone for Deepwater's Block Island Offshore Wind Project". alstom.com. Archived from the original on 2015-05-18. Retrieved 2015-05-10.
  5. ^ "Offshore Wind Farm Raises Hopes of U.S. Clean Energy Backers". The New York Times. 24 July 2015. Archived from the original on 27 January 2017. Retrieved 1 March 2017.