Block Island Wind Farm | |
---|---|
Country |
|
Location | New Shoreham, Rhode Island |
Coordinates | 41°06′53″N 71°31′16″W / 41.1147°N 71.5211°W |
Status | Operational |
Construction began | 2015 |
Commission date | 12 December 2016[1] |
Construction cost | $290 million |
Wind farm | |
Type | |
Distance from shore | 3.8 mi (6.1 km) |
Hub height | 100 m[2] |
Rotor diameter |
|
Rated wind speed | 3–25 m/s[3] |
Power generation | |
Units operational | 5 × 6 MW |
Make and model | GE Renewable Energy Haliade 150-6MW (5) |
Nameplate capacity |
|
Capacity factor | 47.6% (projected)[4] |
Annual net output | 125 GW·h |
External links | |
Website | us |
Commons | Related media on Commons |
Block Island Wind Farm was the first commercial offshore wind farm in the United States,[5] located 3.8 mi (6.1 km) from Block Island, Rhode Island in the Atlantic Ocean. The five-turbine, 30 MW project was developed by Deepwater Wind, now known as Ørsted US Offshore Wind.
Construction began in 2015, and in late summer 2016, five Alstom Haliade 150-6MW turbines were erected. Operations were launched in December 2016.[4] It is the largest project using wind power in Rhode Island.