Blue Line (Chennai Metro)

Blue Line
A train on the Blue Line
Overview
StatusIn operation
Termini
Connecting linesOperational (1):
Green Line
Upcoming (3):
Purple Line Orange Line Red Line
Stations26
Service
TypeRapid transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Depot(s)Wimco Nagar
Rolling stockAlstom
History
Opened21 September 2016; 8 years ago (2016-09-21)
Technical
Line length32.65 km (20.29 mi)
Number of tracks2
Character17 km (11 mi) Underground
15.65 km (9.72 mi) Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Operating speed80 km/h (50 mph)
Route map

Wimco Nagar Depot
Wimco Nagar Depot
Wimco Nagar
Tiruvottriyur
Thiruvottriyur Theradi
Kaladipet
Toll Gate
New Washermanpet
Tondiarpet
Sir Theagaraya College
Washermanpet
Mannadi
High Court
M.G.R Central
Green Line
Government Estate
LIC
Thousand Lights Purple Line
AG – DMS
Teynampet
Nandanam Orange Line
Saidapet
Little Mount
Guindy
Arignar Anna Alandur
Nanganallur Road
Meenambakkam
Chennai International Airport Chennai International Airport
Pallavaram
Kothandam Nagar
Chromepet Bus interchange
Mahalakshmi Colony
Thiru.Vi.Ka Nagar
Tambaram Bus interchange
Irumbuliyur
Peerkankaranai
Perungalathur
Vandalur
Arignar Anna Zoological Park
Kilambakkam Bus interchange

The Blue Line is one of the two operational lines of Chennai Metro apart from the Green line. The line stretches from Chennai Airport to Wimco Nagar Depot, covering a distance of 32.65 km (20.29 mi). The line consists of 26 stations out of which 13 stations are underground and the rest are elevated or on ground level. In May 2018, operations on the blue line commenced between Saidapet and AG-DMS with the extended underground stretch from AG-DMS to Washermanpet of blue line commencing operations on 10 February 2019 completing the phase 1 of the metro.

Map

An airport-bound metro at Alandur station