Brown Line (Bangkok)

MRT Brown Line
รถไฟฟ้าสายสีน้ำตาล

 13 
Overview
StatusDesign phase, planned tender in late 2024
OwnerMass Rapid Transit Authority of Thailand
LocaleBangkok and Nonthaburi, Thailand
Termini
Stations20
Service
TypeMonorail
SystemMRT
Daily ridershipest. 70,000-80,000
Technical
Line length22.1 kilometers (13.7 mi) (est.)
Number of tracks2 monorail tracks
CharacterElevated
Operating speed80 km/h (50 mph)
Route map

MRT Purple Line Bang Krasor Right arrow
Nonthaburi Civic Center
MRTA Pink Line Khae Rai Right arrow
MRT Purple Line Ministry of Public Health Right arrow
Ngam Wong Wan 2 Akkanee
Ngam Wong Wan 18 Chulakasem
Chinnakhet
Dark Red Line Left arrow Wat Samian Nari - Thung Song Hong Right arrow
Airport Link
Bang Khen
Kasetsart Gate 2
Sukhumvit Left arrow Royal Forest DepartmentSena Nikhom Right arrow
Yaek Kaset(Kasetsart University)
Klong Bang Bua
Prasert Manukitch - Lat Pla Klao
Prasert Manukitch - Sena Nikhom
Satriwithaya 2
Grey Line Left arrow Nuanchan – Klong Lamchiak Right arrow
Chalong Rat Expressway
Klong Lamchiak
Nuanchan
Prasert Manukitch - Nawamin
Pho Kaew
Inthrarak
Nawaminphirom Park
National Housing Authority
MRT Orange Line Left arrow Si Burapha - Ram Khamhaeng 34 Right arrow
MRTA Yellow Line Left arrow Si KrithaBang Kapi Right arrow
Yaek Lam Sali

The MRT Brown Line is a 22.1 km rapid transit line in Bangkok, Thailand proposed monorail mass transit line from Nonthaburi Civic Centre, Nonthaburi Province to Lam Sali intersection, Bang Kapi District. 20 stations are proposed for the line and the expected cost for the project is 48 billion baht. The line has been integrated for 7.2 km with the N2 expressway project and a feasibility study has been completed. The MRT Brown line will interchange with 7 other mass transit lines.

The MRT Brown line investment plan was approved by the MRTA Board in June 2019 for final detailed design,[1] which was expected to be completed by December 2020. However, the detailed design will take longer and is not expected to be completed until September 2022.[2] In mid May 2022, the MRTA received updated consultants studies and started drafting the TOR for the project.[3] On 18 May 2023, the MRTA Board meet to approve the updated designs & analysis and draft tender documents for the line. The documents will be submitted to the Ministry of Transport in the coming months.[4]

The project will seek final Cabinet approval in early 2024 and is now planned to be tendered as a PPP project in late 2024.

  1. ^ "บอร์ดรฟม.ไฟเขียวควักเอง 1.4 พันล้านสร้างฐานรากรถไฟฟ้าสายสีน้ำตาล คาดสร้าง". 6 June 2019.
  2. ^ "รฟม.จ้างทบทวนออกแบบโมโนเรลสายใหม่"สีน้ำตาล"". Daily News. 29 November 2021.
  3. ^ "ได้เวลาลุย! รถไฟฟ้าสายใหม่ "สีน้ำตาล" 4.8หมื่นล้าน". Daily News. 15 May 2022.
  4. ^ "รถไฟฟ้าสายใหม่ "สีน้ำตาล" วัดใจรัฐบาลได้ไปต่อหรือล้ม". Daily News. 23 May 2023.