Budhigandaki Hydroelectric Project

The Budhi Gandaki Hydroelectric Project is a proposed hydroelectric power plant in Nepal, to be developed by Nepal Electricity Authority (NEA).

This storage hydropower plant is to be located on the Budhi Gandaki River, approximately 2 km upstream of its confluence with Trishuli River, about 55 km west of Kathmandu (80 km by road).[1]

Budhi Gandaki Hydropower project
Budhigandaki Hydroelectric Project is located in Nepal
Budhigandaki Hydroelectric Project
Location of Budhi Gandaki Hydropower project in Nepal
CountryNepal
LocationGhyalchok, Gorkha district, Western Development Region / Salang, Dhading district, Central Development Region
Coordinates27°49′32″N 84°46′25″E / 27.82556°N 84.77361°E / 27.82556; 84.77361
PurposePower
StatusProposed
Construction cost$2.5 billion [2]
Dam and spillways
ImpoundsBudhi Gandaki River
Height (thalweg)263 m [1]
Spillway capacity12,827 m3/s [1]
Reservoir
Total capacity3,3 km3 [1]
Catchment area5.000 km² [3]
Surface area49.8 km² [1]
Maximum length45 km [4]
Normal elevation540 m [3]
Power Station
TypeStorage [1]
Hydraulic head185 m [1]
Installed capacity1,200 MW [3]
Annual generation3,383 GWh [5]

With its planned installed capacity of 1,200 MW, it is the largest hydropower project in Nepal (before 900 MW Upper Karnali and Arun III projects), being sometimes considered a national pride.[1] The 225 meters high dam will also be one of the highest in the country.

Aside from the dam, a 225 km long ring road will be built all around the future reservoir, which may also serve as a tourist attraction.[4]

The site has been identified as early as in the late 1970s.[3] A pre-feasibility study was carried out in 1984, and a first feasibility study in 1998.[1] Additional studies conducted by the NEA in 2010–2011 in order to optimize hydropower potential use on the site led to the current proposal.[1]

As of May 2019, the resettlement process was ongoing, with Rs 20 billion already spent in land acquisition in both concerned districts, and another Rs 18 billion set aside to complete compensation by the next fiscal year.[2] In the meanwhile, Finance Misistry started to raise concerns over the total cost of the project.

In June 2019, the 635 MW Dudh Koshi Hydroelectric Project was favoured by NEA to Budi Gandaki HPP, due to its lower social impact ("only" 162 households severely impacted), lower cost ($1.5 billion), slightly higher and substantially more steady power output, thanks to its feeding by Mount Everest snowmelt during the dry season. Conversely, Budhi Gandaki HPP, which used to be considered "top priority",[2] was compromised by its massive cost and uncertainty related to population relocation.[6] As a result, financing and construction of the latter might not occur during the next few years.

As of November 2019, a total Rs 37 billion ($300 million) had been raised for the project, mostly via an infrastructure tax on petroleum products imports. This tax allows to collect an estimated Rs 1 billion per month. The government targets to achieve the compensation process by mid-July 2020.[7][needs update]

  1. ^ a b c d e f g h i j "Budhi Gandaki Hydropower project". Engineering Helpline. Retrieved 23 April 2020.
  2. ^ a b c "Budhi Gandaki project plans to complete compensation distribution by next fiscal year". The Kathmandu Post. Retrieved 23 April 2020.
  3. ^ a b c d "About the Project". Government of Nepal, Ministry of Energy, Water resources and Irrigation. Retrieved 23 April 2020.
  4. ^ a b "Land required for Budhi Gandaki project marked". The Kathmandu Post. Retrieved 23 April 2020.
  5. ^ "Energy officials lean towards Dudh Koshi Hydroelectric Project". EnregyCentral. 27 June 2019. Retrieved 23 April 2020.
  6. ^ "Energy officials lean towards Dudh Koshi Hydroelectric Project | Energy Central". energycentral.com. 27 June 2019. Retrieved 2020-04-22.
  7. ^ Republica. "Rs 37 billion collected so far to build Budhi Gandaki Hydroelectric Project". My Republica. Retrieved 2020-04-23.