CRRC Qingdao Sifang CR151

CRRC Qingdao Sifang CR151
Exterior mockup of the CR151
Interior mockup of the CR151
In service2030 (Projected)
ManufacturerCRRC Qingdao Sifang
Built atQingdao, Shandong, China
Constructed2025 – 2030
Entered service2030
Number under construction264 Vehicles (44 Sets)
Formation6/8 per trainset
DT–Mp–Mi+Mi–Mp–DT
Capacity1920 passengers per 6-car train
DepotsChangi East
Lines served CRL  Cross Island Line
Specifications
Car body constructionWelded aluminium
Train length138.5 m (454 ft 4+34 in)
Car length
  • 23.65 m (77 ft 7+18 in) (DT)
  • 22.8 m (74 ft 9+58 in) (Mp/Mi)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 10 per car, 5 per side
Maximum speed90 km/h (56 mph) (service)
Electric system(s)1,500 V DC Overhead conductor rail
Current collector(s)Pantograph
Safety system(s)Siemens Trainguard Sirius moving block CBTC ATC under ATO GoA 4 (UTO)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Company and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.[2]

  1. ^ "Siemens Mobility awarded contract to deliver CBTC on Singapore's ..." press.siemens.com. 17 April 2023. Retrieved 17 December 2023.
  2. ^ Cite error: The named reference SCRL44 was invoked but never defined (see the help page).